This innovative project included making alterations to an existing industrial building in order to maintain the front façade. A new structure would be built on the three remaining boundaries. This included the excavation to create a new ground floor slab, an introduction of a mezzanine level, a lift shaft and fire stairs. A roof top play area over the existing structure was also added.
The result was a brand new, exciting facility suitable for 162 children over five storeys including the rooftop area.